85.
Install gasket (80) and high-pressure cylinder head (78). Install high-pressure cylinder head and secure with six nuts
(79). Tighten nuts evenly and pull high-pressure cylinder head in place. Refer to table D-1 for torque specifications.
86.
Install gasket (77) on low-pressure cylinder head (75). Install low-pressure cylinder head and secure with nuts (76).
Tighten nuts evenly and pull low-pressure cylinder head in place. Refer to table D-1 for torque specifications.
87.
Install three discharge valves (74), valve plugs (73), and unloader capnuts (72).
88.
Install three inlet valves (71), unloader valve plugs (70), unloaders (69), brass spacers (68), and unloader capnuts
(67).
89.
Install unloader pipe fittings (64), (65), and (66).
90.
Install unloader tubes (62) and (63).
91.
Install oil pressure tubing (58) and secure with two capscrews (57).
92.
Install pulley (47) on flange (46) and secure with four bolts (45), spacers (44), and nuts (43).
93.
Install coupling flange assembly (42), nut (41), and cotter pin (40).
94.
Install El safety valve (39).
95.
Install gasket flange (38), spacer (37), and gasket flange (36).
96.
Install gasket flange (35), spacer (34), and gasket flange (33).
97.
Install two gaskets (61) and two side covers (60). Secure with 26 bolts (59).
98.
Perform a leak test and check that intercooler (19) does not leak. Replace damaged intercooler.
99.
Install bottom flange assembly (31), gasket (32), 16 lockwashers (30), nuts (29), and bolts (28).
100. Install top flange assembly (26), gasket (27), 16 lockwashers (25), nuts (24), and bolts (23).
101. Install 12 lockwashers (21), bolts (20), and outer core assembly (22).
102. Install items (19) thru (32) and secure with two lockwashers (17), bolts (16), two spacers (18), and eight nuts (15).
4-24