b.
Team b carries out the same operations as Team A, but with the sleepers numbered from 201 up as in Drawings
3 to 13.
c.
Team C is only needed it the sleepers cannot be stacked near the site (see 3.a. above). In that case, it feeds
Teams A and B with sleepers.
5. The assembly time, which is 45-50 minutes for a normal ramp, is considerably longer when lashing enters into the
construction of the ramp.