TM 55-2210-224-12
ALPHABETICAL INDEX
Subject, Para
Subject, Para
L (cont)
Fuel tank, 1-9
Main generators, 1-9
Main reservoir air tanks, 1-9
Master controller, 1-9
Sandbox and sand controllers, 1-9
Tailpipe housing, 1-9
Traction motors, 1-9
Location and use of controls and indicators, 2-2
Lubrication, instructions, 3-1
M
Main generator:
Brushes, 4-35
Location and description, 1-9
Tabulated data, 1-10
Technical principles of operation, 1-12
Main reservoir air tank, 1-9
Maintenance forms, records, and reports, 1-2
Marking for shipment, 4-49
Master controller:
Location and description, 1-9
Location and use, 2-3
Miscellaneous controls, 2-3
Miscellaneous control devices:
Battery switch, 1-14
Engine temperature warning relay
(ETWR), 1-14
Ground relay (GR), 1-14
Ground relay cutout switch (GRCO), 1-14
Motor kill relay, 1-14
Safety relays, 1-14
Timer, 1-14
Transition relay panel, 1-14
Monthly service, 4-6
Motors, electrical:
Cab heater, 4-24
Traction, 1-9
Moving light locomotive, 2-14
Multiple-unit control jumper, 4-31
Multiple-unit engine system warning bell, 4-21
Multiple-unit operation, 2-29
O
Operator Controls and Indicators, 2-3
Operator/crew maintenance, 3-3
Operator troubleshooting procedures:
Introduction, 3-2
Symptom index:
Air compressor, 3-2
Brake system, 3-2
Electrical instruments and controls, 3-2
Engine, 3-2
Operation of fire extinguisher, 2-30
Operation under unusual conditions:
At high altitude, 2-36
Cutting out traction motors, 2-39
In dusty or sandy areas, 2-33
In extreme cold, 2-32
In extreme heat, 2-31
In rainy or humid conditions, 2-34
In saltwater areas, 2-35
Rerailing, 2-38
Running through water, 2-37
Towing locomotive dead, 2-40
Operation under usual conditions:
Brake system, 2-9
Braking with power, 2-27
Changing direction with light locomotive, 2-16
Coupling to train and pumping up air, 2-18
Cutting off locomotive with or without cars, 2-20
Emergency application of brakes, 2-26
Emergency stop, train, 2-28
Ground relay action, 2-24
Load limits, 2-23
Moving light locomotive, 2-14
Multiple unit operation, 2-29
Precautions before moving locomotive, 2-12
Preoperation air brake test, 2-13
Prestart instructions, 2-10
Running over railroad crossovers, 2-25
Safety warning bell assembly, 4-19
Starting engine, 2-11
Starting train, 2-21
Stopping engine, 2-17
Stopping light locomotive, 2-15
INDEX 3