TM 55-2210-223-12
TO 45A2-2-14-41
CHAPTER 4
UNIT MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
4-1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
4-2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
No special tools are required by unit maintenance for the maintenance of the locomotive. Test, measurement, and
diagnostic equipment (TMDE) and support equipment include standard equipment found in any unit maintenance shop.
4-3.
REPAIR PARTS
Repair parts are listed and illustrated in TM 55-2210-223-24P, Repair Parts and Special Tools List, covering unit
maintenance for this locomotive and in TM 2815-232-24P for the engine.
Section II. SERVICE UPON RECEIPT
4-4.
GENERAL
Upon receipt of the locomotive, you must determine if the locomotive has been properly prepared for service. Inspect
the equipment as follows:
a.
Inspect assemblies, subassemblies, and accessories to be sure they are in proper working order.
b.
Secure, clean, lubricate, or adjust as needed.
c.
Check Basic Issue Items to be sure every item is present, in good condition, properly mounted, or stowed.
d.
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on SF Form 364, Report of Discrepancy (ROD).
e.
Check the equipment against the packing slip to see if the shipment is complete. Report discrepancies in
accordance with the instructions of DA PAM 738-750.
4-1