TM 55-2210-223-34
TO 45A2-2-14-22
3-7. ENGINE HOOD AND HANDRAIL ASSEMBLIES
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools
Personnel Required
Tool kit SC 4940-97-CL-E12
3
Equipment Condition
Reference
Condition Description
TM 55-2210-223-12
Muffler removed
REMOVAL
1.
Remove engine hood by the following:
a.
Remove eight screws (1) and clamps (2) and disconnect PCS air supply tubing
and temperature gage wiring conduit from hood.
b.
Remove six screws (3), nuts (4), and clamps (5) and disconnect hood lamp wiring conduit.
c.
Remove 29 bolts (6) and lockwashers (7).
d.
Remove 26 bolts (8) and lockwashers (9).
e.
Remove 26 nuts (10), lockwashers (11), and flat washers (12).
f.
Remove bolts (13) and (14), nuts (15) and (16), and ground strap (17).
g.
Install lifting eyes and cables at four corners of handrail (22).
WARNING
Components of this engine hood and door assembly are heavy and may be
awkward to handle. Use correct lifting procedures, indicated lifting devices, and/or
assistance from other personnel to avoid injury.
NOTE
Check that hood is free of interference.
Taglines may be used to steady hood when lifting.
h.
Position a person on each side of locomotive to guide lifting operation.
3-33
