TM 55-2210-224-34
4-9. DIESEL ENGINE (cont)
REMOVAL (cont)
f.
Loosen hose clamps (21) and (22) and remove expansion water pipe (23).
g.
Loosen hose clamps (24) and (25) and disconnect inlet water pipe (26) from radiator.
3.
Station a person on each side of locomotive to observe lifting operation and to check that no binding o
ccurs.
4.
Use a suitable lifting device and slowly lift diesel engine from locomotive. Lower to ground and set on a suitable
support.
INSTALLATION
5.
Station a person on each side of locomotive to observe installation operation and to check that no binding occurs.
6.
Use a suitable lifting device and slowly lift diesel engine above locomotive. Slowly lower to deck. Support rear of
engine with a suitable support device.
7.
Install right side of diesel engine by the following:
a.
Install inlet water pipe (26) on radiator and tighten hose clamps (25) and (24).
b.
Install expansion water pipe (23) and tighten hose clamps (22) and (21).
c.
Install outlet water pipe (20) and tighten hose clamps (19) and (18).
d.
Install expansion water pipe (17) and tighten hose clamps (16) and (15).
e.
Connect capillary tubing (14) to engine water manifold.
f.
Install conduit (13) to electrical box (11) and connect wiring (12) to engine water heater and remove
tags.Position cover (10) and install two screws (9).
g.
Connect wiring (7) to engine alternator (8) and install two nuts (6). Remove tags.
8.
Prepare left side of diesel engine for installation by the following:
a.
Connect engine oil pressure gage line (5) to engine block.
b.
Connect solenoid valve wiring (3) to terminal strip (4) and remove tags.
c.
Install lockwasher (2) and screw (1).
4-34
