TM 55-2210-224-34
3-7. ENGINE HOOD ASSEMBLY
This task covers:
a. Removal
c.
Cleaning
e.
Repair
g.
Installation
b. Disassembly
d.
Inspection
f.
Assembly
INITIAL SETUP
Tools
Material/Parts
Tool kit SC4940-97-CL-E12
Drycleaning solvent (Item 34, Appendix B)
Suitable lifting device
Rubber silicone adhesive (Item 1, Appendix B)
Personnel Required
3
REMOVAL AND DISASSEMBLY
1.
Tag and disconnect cowling light and headlight wiring (1) from terminal board (2).
2.
Remove nut (3), lockwasher (4), and capscrew (5) and remove clamp (6) from water pipe (7).
3.
Remove eight nuts (8), lockwashers (9), and capscrews (10) from muffler flange (11)
. Remove gasket (12).
4.
Loosen two hose clamps (13) and remove hose (14) from breather (15).
5.
Remove six capscrews (16) and lockwashers (17) from tailpipe guard (18).
6.
Remove 25 capscrews (19), lockwashers (20), and flat washers (21).
7.
Remove 12 capscrews (22), lockwashers (23), and radiator grille (24).
8.
Remove 20 capscrews (25), lockwashers (26), and flat washers (27).
9.
Remove 14 capscrews (28), lockwashers (29), and nuts (30)
. Remove lower radiator flashing (31).
10.
Remove eight nuts (32) and lockwashers (33)
. Position two sand controller (34) out of the way
. Remove two pipe
nipple and brackets (35) from bottom of sandboxes.
11. Pass lifting cables through hood doors
. Attach lifting cables to suitable lifting device.
12.
Check that hood is free of interference.
13.
Position a person on each side of locomotive to guide lifting operation.
3-30
