TM 55-2210-224-34
3-7. ENGINE HOOD ASSEMBLY (cont)
ASSEMBLY AND INSTALLATION
21.
Apply rubber silicone adhesive to cab bulkhead mounting joint.
22.
Pass lifting cables through hood doors.
23.
Position a person on each side of locomotive to guide installation procedure.
WARNING
Components of this locomotive are heavy and may be awkward to handle. Use correct lifting
procedures, indicated lifting devices, and/or assistance from other personnel to avoid injury.
CAUTION
Care should be taken when lifting engine hood assembly to prevent binding, uneven balance, or
damage to engine components.
24.
Use a suitable lifting device and raise engine hood assembly over locomotive. Lower hood to deck.
25.
Install two pipe nipple and brackets (35) in bottom of sandboxes
. Position two sand controller (34) and install eight
lockwashers (33) and nuts (32).
26.
Position lower radiator flashing (31) and install 14 flat washers (30), lockwashers (29), and capscrews (28).
27.
Install 20 flat washers (27), lockwashers (26), and capscrews (25).
28.
Position radiator grille (24) on engine hood and install 12 lockwashers (23) and capscrews (22).
29.
Install 25 flat washers (21), lockwashers (20), and capscrews (19).
30.
Position tailpipe guard (18) and install six lockwashers (17) and capscrews (16).
31.
Install hose (14) on breather (15) and tighten two hose clamps (13).
32.
Position gasket (12) on muffler flange (11) and install eight capscrews (10), lockwashers (9), and nuts (8).
33.
Position clamp (6) on water pipe (7) and install capscrew (5), lockwasher (4), and nut (3).
34.
Connect cowling light and headlight wiring (1) to terminal board (2) and remove tags.
3-33