TM 55-2210-223-12
TO 45A2-2-14-41
4-24. HEATER LINES, HOSES, AND FITTINGS (cont)
INSTALLATION (cont)
58.
Install two clamps (24), bolts (23), lockwashers (22), and nuts (21).
59.
Install two hose clamps (16) on flexible hose (17). Install nipple (19) in engine block heater (20). Install nipples
(18), and flexible hose. Tighten clamps.
60.
Install nipple (10) in engine block heater thermostat (11).
61.
Install 90-degree elbow (9), nipple (8), 90-degree elbow (7), nipple (6), and union (5).
62.
Install clamp (15), bolt (14), lockwasher (13), and nut (12).
63.
Install clamp (4), bolt (3), lockwashers (2) and nut (1).
4-61