This task covers:
a.
Removal
b.
Inspection
c.
Installation
INITIAL SETUP :
Tools
Personnel Required
Tool kit SC 4940-97-CL-E12
2
Equipment Condition
Reference
Condition Description
Para 3-33
Main generator removed
Para 3-40
Air compressor removed
Para 4-9
Engine removed
REMOVAL
1.
Remove 10 nuts (1), flat washers (2), and springs (3).
WARNING
Components of this locomotive are heavy and may be awkward to handle. Use correct lifting procedures
indicated lifting devices, and/or assistance from other personnel to avoid injury.
2.
Check that tie straps and electrical conduit have been disconnected.
3.
Attach suitable lifting device to motor mounting frame (4) and remove from locomotive deck.
4.
Remove cork gasket (5) from locomotive deck.