TM 55-2210-223-34
TO 45A2-2-14-22
3-16.
SANDER CONTROL VALVE (cont)
ASSEMBLY
26.
Install two new O-rings (39), three plungers (38), and two plunger bodies (37).
NOTE
Dowels must be alined on actuating cup.
27.
Install piston stem (36), neoprene valve seat (35), new O-ring (34), actuating piston (33), new rubber cup (32),
new O-rings (31) and (30), and actuating cap (29). Secure with lockwashers (28) and screws (27).
28.
Install new O-rings (26) and (25) on solenoid valve body (24).
29.
Install new plunger seat (22) in plunger cap (23).
30.
Install plunger seat (20) and plunger spacer (21) into plunger body (19).
Install plunger cap (23) on plunger body.
31.
Install spring (18) on plunger body (19).
32.
Install spring (18) and plunger body (19) in coil pole (17).
33.
Install solenoid valve body (24).
34.
Install terminal insulators (16) on coil case (15).
35.
Install coil case (15) in field yoke (14).
36.
Install field yoke (14) and coil case (15) and secure with O-ring (13) and exhaust nut (12).
37.
Assemble valve assembly (7) by the following:
a.
Install new neoprene valve seat (10) and seat washer (9) on valve stem (11).
b.
Secure with locknut (8).
38.
Install valve assembly (7) and spring (6). Secure with spring cap (5).
39.
Install O-ring (3) and strainer plug (4) in valve body (2).
40.
Install gasket (1).
NOTE
If a repair kit is installed in sander control valve, check that gasket (1) remains
with repaired valve for installation procedures.
3-54