TM 55-2210-224-34
3-17.
SANDER CONTROL VALVE (cont)
ASSEMBLY
23.
Use pneumatic grease and lubricate O-rings (3), (15), (26), (27), (31), (32), (35), and (40), actuating piston (34),
and rubber cup (33). Use a clean wiping rag and remove excess grease.
24.
Install two O-rings (40), plungers (39), and plunger bodies (38).
NOTE
Dowels must be alined on actuating cap.
25.
Install piston stem (37), neoprene valve seat (36), O-ring (35), actuating piston (34), rubber cup (33), O-rings (32)
and (31), and actuating cap (30). Install four lockwashers (29) and screws (28).
26.
Install O-rings (27) and (26) on solenoid valve body (25).
27.
Install plunger seat (23) in plunger cap (24).
28.
Install plunger seat (21) and plunger spacer (22) in plunger body (20).
Install plunger cap (23) on plunger body.
29.
Install spring (19) on plunger body (20).
30.
Install spring (19) and plunger body (20) in coil pole
(18).
31.
Install solenoid valve body (25).
32.
Install field yoke (16) and coil case (17) on coil pole (18). Install O-ring (15) and exhaust nut (14).
33.
Position cover (13) and install two screws (12).
34.
Assemble valve assembly (7) by the following:
a.
Install neoprene valve seat (10) and seat washer (9) on valve stem (11).
b.
Install locknut (8).
35.
Install valve assembly (7) and spring (6). Install spring cap (5).
36.
Install O-ring (3) and strainer plug (4) in valve body (2).
NOTE
If a repair kit is installed in sander control valve, check that gasket (1) remains with repaired valve
for installation procedures.
37.
Install gasket (1).
3-56
